Cupertino Electric (CEI) performed numerous installations for Toyota Logistics at its facility in Fremont, California. At an existing 20,000-square-foot building, CEI performed tenant improvement electrical services that upgraded the lighting, increased the power distribution to equipment, installed moveable plug-in power above car lifts and updated the lighting and power devices within the 5,000-square-foot office area. CEI also installed new power to rooftop units on the existing building.
CEI also worked on three new buildings, including a 35,000-square-foot building used to upgrade stock Toyota vehicles, a 5,000-square-foot building with a carwash and paint booth and a 10,000-square-foot office building featuring private offices, a board room, a lunch room and open office space.