Name:
222 Second Street
Description:
A ground-up core/shell build and a tenant improvement Design/Build electrical construction project.
Location:
San Francisco, CA
Project Size:
450,000 sq. ft.
Project Attributes:
Green

Project Summary

CEI was the main electrical contractor at 222 Second Street during the core/shell construction and the complete tenant improvement project that outfitted the entire 26-floor high-rise for a very large career social media client. The build-out of this space included numerous indoor and outdoor amenities, including: 

  • A full commercial-grade kitchen to serve all office employees
  • A café, small kitchen and outdoor seating area with a fireplace
  • An all-hands area with production lighting
  • Conference rooms, open offices, copy centers and small kitchens or break rooms on each floor

The site features high-end light fixtures, including custom LED fixtures and specialty decorative lighting integrated into the wireless Enlighted lighting control system. The power usage of the tenant space is monitored via a networked metering system.

CEI's scope of work for the core/shell portion of the project was plans and specs while it was the Design/Build electrical contractor during the tenant improvement project.

We Value Your Privacy

We may use cookies to enhance your browsing experience. You can opt-out of by clicking Reject. Refer to our External Privacy Policy for more information

Reject
Accept